First Estates Pipera Residence Phase 1&2, Romania
  • Client: Alsin Management
  • Project: Residential Project
  • Date: June 10, 2023 / March 20, 2024
  • Project Location: Bucharest, Romania

First Estates Pipera Residence Phase 1&2, Romania


For those looking to start a new life or a new job in the real estate sector, we present First Estates, our new project, where we work with integrity of mind, body, and soul. With its unique architectural design, it is located at Voluntari 077190 in the Pipera district, a 5-minute walk from the OMV intersection and Pipera Plaza. The area also houses numerous prominent office buildings and prestigious educational institutions. One of the most welcoming buildings in the northern region, the building comprises four buildings, each with a basement, ground floor, and eight floors. It features over 500 underground and aboveground parking spaces and 464 bright and inviting apartments ranging from 45 to 105 square meters. First Estates Residence offers all these advantages, as well as photovoltaic panels and electric vehicle charging stations. An elegant blend of elegance, quality, and comfort defines the First Estates concept, embracing the highest standards of exclusivity. First Estates Pipera is being built in two phases, comprising multiple residential units including studios, two-, three-, and four-bedroom apartments. The first phase will include 232 apartments, with completion in July 2024, and the second phase will include 232 apartments, with completion in July 2025.
Yukarı